COMMISSIONING SERVICES HIGHLIGHTED 

  • Verification for proper equipment and devices installation
  • Verification for proper systems test and start-up by the contractor and/or manufacturer's representative
  • Coordination with Test and Balancing team
  • Pre-commissioning coordination meeting
  • Pre-functional test checklist
  • Functional performance test requirements
  • Commissioning procedures Acceptance test Facility Manual
  • Staff training

Following the established procedures, general scope of work, and the supplied forms will assure a proper documentation and successful completion of the Systems Commissioning procedure.

COMMISSIONING PROCEDURES

Pre-Commissioning Meeting:

  • Site meeting with construction team.
  • Review of commissioning procedure and schedule with the construction team.
  • Distribution of Contractor Pre-Start-Up and Start-Up Inspection Checklist forms.
    Pre-Commissioning Start-Up:
  • All Pre-Start-Up and Start-Up checklist forms completed by the respective sub-contractor
  • All forms verified and signed by the Project Superintendent.
  • All forms reviewed and approved by the Commissioning Agent. Any items not completed will be returned to the Project Superintendent.
    Systems Air Balance:
  • Project air balance time schedule, submitted by the Project Superintendent.
  • Pre-balance activities by the Air Balance Sub-Contractor.
  • Project air balance process completed by the Air Balance Sub-Contractor.
  • Review of final air balance reports.
Systems Commissioning:
  • Verification for proper equipment and devices installation
  • Schedule with Project Superintendent site visit and meeting with mechanical, electrical, and air balance sub-contractors.
  • Verify equipment installation.
  • Verify equipment operation.
  • Verify control system operation.
  • Verify standby generating system operation.
  • Verify lighting controls operation.
  • Set-up trend logs to record system performance data.
  • Test HVAC system operation and control modes.
  • Remote system monitoring and data acquisition (during preparation of commissioning report).
  • Complete and submit commissioning report.
  • Submit owner manuals.
  • Schedule formal owner training with operations.
 

PROJECT LINKS
Hospitality
Healthcare
Commercial
Entertainment
Institutional
Military
Industrial
High Technology
Educational
Residential
 
   Search: all words any words exact phrase
© Copyright Popov Engineers, Inc. 2008
   
 
  home | the firm | services | projects | careers | contacts