CURRENT
PROJECTS
John
Wayne Airport
Santa Ana, California
The
$ 18.0 M project provides for the design and construction of an
on-site, hybrid Co-Generation Plant and a Central Plant with a heat
recovery system capable of supporting airport operations.
The
co-generation facility will include multiple natural gas-fired internal
combustion engine generators with a total installed capacity of
7,000 kilowatts and a chilled water supply capacity of 2,700 tons
of refrigeration generated from a combination of electric driven
centrifugal and absorption chillers.
Once
completed, the Co-Generation Facility and Central Plant will be
able to provide JWA with an economic and dependable energy source
to meet the energy, safety, security and comfort requirements for
the existing terminals and the future terminal building expansion.
CHW Bakersfield Memorial Hospital
Bakersfield, California
The
$30.4 million project provides for the multiphase development of
approximately 84,000 square feet consisting of a new four-story,
103 bed patient tower to be built on top of an existing single-story
Labor Delivery Unit, the expansion of the Emergency Department building
with a total of 30 beds, admissions and support areas and the extension
of the East Tower elevator to access the 4th through 6th floors.
The final phase will include a 1,500 square foot expansion and renovation
of the main Lobby.